Opens in a new tab

How to Write a Tech Pack for Clothing Manufacturers in China

2026-10-30
Share:

How to Write a Tech Pack a Clothing Manufacturer in China Can Quote From

A tech pack is the specification document a factory builds from. Get it right and the first sample lands close to intent. Get it wrong and you lose a sampling round to missing measurements or a print placement nobody agreed on.

From the floor: Sourcing threads on Reddit and manufacturer education posts (Ohzehn Textiles, TechPack Genius) repeatedly name spec ambiguity, payment terms and a certification gap as the three reasons a first order stalls. The tech pack fixes the first one before it starts.

The five fields that drive the build

FieldWhat to putWhy it matters
MeasurementsGraded size set with tolerances, not just one sample sizeThe sewing line cuts and sews to the numbers. Vague grades drift across sizes.
ConstructionSeam type, stitch count, hem and facing notesTwo plants, one standard: the note tells both lines how the seam is built.
MaterialsFabric or yarn name, weight, compositionKnit runs on our own lines at the Ningbo knit plant; sweaters on flat machines at the Ningbo sweater plant. The material decides the line.
ColourPantone reference plus a physical swatchColour is matched on a light box at both plants to one standard.
ArtworkVector file, placement with measurements from a fixed pointPrint and embroidery placement is where packs most often fall short.

How the two plants read one pack

United Fish runs two Ningbo plants, one standard, one merchandiser. The knit and woven cut and sew line builds jersey, rib, interlock and woven styles. The flat knitting line builds sweaters and cardigans on machines from 7GG to 18GG, with circular knitting from 12G to 28G for other programmes. One merchandiser owns your order across both plants, so a cardigan and a knit dress in one palette match on the shelf.

CAD plotting and tech pack development at the Ningbo merchandising office
Tech pack and marker development at the Ningbo merchandising office. The same pack drives both plants under one colour and inspection standard.

The fields buyers most often miss

  • Tolerances. A measurement without a tolerance is a debate. Write the allowed range.
  • Trim specification. Labels, zippers, buttons and trims need a source or a reference. An unspecified trim becomes a guess.
  • Placement measurements. Print and embroidery need a distance from a fixed point, usually the shoulder seam or the centre front.
  • Care and compliance. If the market needs REACH or OEKO-TEX limits, state them in the pack so the material is sourced to the right limit from the start.
Payment terms trap: education posts warn against deposits paid before a confirmed proto. At United Fish the path is clear: 20% deposit, 80% balance by T/T or L/C at sight, with the proto and PP sign off before bulk.

Sampling lead time

First sample returns in 7 to 10 days once fabric or yarn has arrived. Proto confirms shape, SMS confirms material hand feel, and PP locks the production standard. Each stage is a written checkpoint, not a phone call.

Ready to spec your line? Send your sketch and we return a quote and a swatch plan within 24 hours.

Get a Quote →

Frequently asked questions

What is a tech pack in clothing?

A tech pack is the specification document a factory uses to build your garment. It carries the measurements, construction notes, materials, colour references and artwork placements so the first sample matches your intent.

Do I need a tech pack for a small order?

Yes. Even at 50 pcs per style, a one page tech pack prevents a full sampling round lost to missing measurements or an unclear placement. The document does not need to be long. It needs to be complete on the five fields that drive the build.

What causes a second sampling round?

Most repeats come from missing tolerances, an unspecified trim, or a print placement with no measurements from a fixed point. Buyers on Reddit repeatedly flag spec ambiguity as the single biggest source of delay and cost.

Who owns the tech pack after production?

You do. The factory builds from it and returns it annotated with any construction notes. Keep the final version as the reference for reorders so the second run matches the first.

Search
×

FeedBack

Please leave your information, we will contact you as soon as possible

popups form