Garment Inspection System — Quality Control in Apparel Manufacturing
Three inspection points, documented reports, and access for third-party inspection before shipment.
How we control quality
Quality is not one check at the end. Every order across our two Ningbo plants passes four defined check points: first inspection, in-line inspection, final inspection before packing, and a pre-shipment inspection. Each one is documented in writing.
If you want independent verification, you can bring in your own inspector or a third-party agency at any reasonable point before shipment. The plant split and output behind every quote: the laboratory testing behind these checks.
Four check points
| Stage | What is checked | Why it is checked here |
|---|---|---|
| ① First inspection: after first-piece approval, early production | Yarn count, colour against the approved shade, visible defects, first-piece measurements | Catching a yarn or first-piece problem here avoids producing a full run of unsellable garments |
| ② In-line inspection: during production, before the run passes halfway | Measurements against the size chart and workmanship details; on the garment line, seams and trims, on the sweater line, linking quality and stitch structure | Corrections made during the run cost far less than reworking finished goods |
| ③ Final inspection: before packing | Measurements, hand-feel, construction, trimming, labelling and packing against the specification; on the knit garment line every piece passes needle detection, on the sweater line every piece is light-checked | This is the check that corresponds to what you will receive |
| ④ Pre-shipment inspection: before dispatch, third party allowed | You, your inspector or a nominated third-party agency inspect on site against the sampling standard agreed for the order | Independent verification runs on your schedule; findings are closed out in writing, not on a verbal promise |

Sampling and bulk timelines are agreed in writing when the order is confirmed: bulk sweaters 30–55 days, bulk knitwear 45–70 days, bulk woven 45–90 days, counted from order confirmation. Sample dates are written into the same confirmation sheet, so progress can be tracked at every stage. We walk through where the inspection points sit in the order on a separate page.
BSCI-audited. OEKO-TEX certified. Certificates on request.
The scans below are the documents behind the claims.
For vendor onboarding, we provide the certificate number, the issuing body and the validity dates for each of our four certificates (BSCI, OEKO-TEX, REACH and GRS) with your quotation, so your compliance team can verify everything directly instead of taking this page at its word.
What the certificates do not cover is whether a seam holds or whether the measurements are right. That is what the four documented inspection points are for: first inspection, in-line inspection, final inspection before packing, and pre-shipment inspection where you or your nominated agency can be present. Unless your order specifies AQL 2.5 sampling inspection, garments are inspected piece by piece before packing. Findings are confirmed in writing with the responsibility and the rework plan, and the re-inspection result ships with the documents.Compliance and inspection are two halves of the same service. Neither one is a claim we ask you to accept on trust. Both are documented, and both are open to your own inspector. Here is what each certificate actually covers, in the order it happens.
The approved sample is the reference
Production is measured against the sample you signed, not against a description. Measurements, hand-feel, colour and construction are all compared back to it, which is why sample sign-off matters more than any other approval in the process.
Minor variation in hand-feel can occur between yarn dye lots. Where this is a risk, we flag it before bulk confirmation.
start your first order today?
→ Talk to your dedicated managerQuality control Faqs
Q : What standard do you inspect against?
A : Your approved sample and the agreed specification. Inspection follows a sampling standard agreed for the order.
Q : Can we appoint our own inspection agency?
A : Yes, at any reasonable point before shipment.
Q : What happens if goods do not match the sample?
A : Discrepancies against the signed sample are handled under the terms agreed before production.
Q : Do small orders get the same inspection?
A : Yes. The process does not change with quantity. See Low MOQ.
Q : Are inspection reports shared?
A : Yes, before shipment.
Q : Can we arrange a further inspection after the first, in-line and final checks?
A : Yes. Any reasonable point before shipment, with your own inspector or a third-party agency. We just confirm the factory access time in advance.
Q : What happens if an inspection finds a problem?
A : The finding is confirmed in writing with the responsibility and the rework plan, the goods are re-inspected afterwards, and the re-inspection result is shared with the shipping documents. You can start at small runs get the same checks and scale the style once it sells. Or ask for our inspection report template, whichever suits you better.
START A PROJECTReady to Build Your Next Collection?
Tell us about your project
a specialist replies with a tailored quote and timeline. No account needed.
Typical reply confirm SLA
Export countries
Low MOQ (pcs)
You can send your tech pack, and we will come back within 24 hours.