
Custom Crochet & Lace Manufacturer
As a crochet clothing manufacturer in China, we run machine and hand crochet alongside cut-and-sew lace programs from 50 pcs per style. Crochet is built loop by loop, either by machine or by hand, and behaves like a knit. Lace arrives as a fabric, whether guipure, eyelet embroidery or stretch lace, and is cut and sewn like any other woven. We do both, and we tell you which one your design actually needs.
The decision that drives cost, lead time and whether the garment sells is coverage. We’ll ask you early whether a piece should be sheer, fully lined, or lined only through the body.
Key facts
| MOQ | 50 pcs per style (sizes mixed) |
|---|---|
| Sampling | 7–10 days when fabric or yarn is available; hand-crochet takes longer |
| Bulk lead time | Machine-crochet 30–55 days · cut-and-sew lace 45–90 days |
| Payment | 20% deposit, 80% balance by T/T or L/C at sight |
Full detail: Circle Knitting & Woven Apparel manufacturing in China.
Full specifications
What we make in this category
- Crochet knit tops and cardigans
- Lace long-sleeve and high-neck blouses
- Sheer lace button-through shirts
- Eyelet embroidery and broderie styles
- Guipure and floral corded lace pieces
- Tie-front crochet cover-ups and kimonos
- Crochet wide-leg trousers
- Mesh and lace-panelled knit tops
| Processes | Machine crochet knit · hand-crochet elements (quoted separately) · cut-and-sew lace |
|---|---|
| Typical fabrics | 90% nylon / 10% spandex lace 190 gsm · cotton-blend lace · corded guipure · eyelet embroidery |
| Coverage options | Fully lined · part-lined · fully sheer |
| Seam finishing | Narrow French seams, binding, clean-finished edges |
| Edges | Scalloped to the lace motif or bound |
| Certificates | Available on request |
How we make Crochet & Lace: fabrics, construction and QC
Coverage: the decision to make first
Three options, and they’re not interchangeable. Fully lined gives opacity and structure, costs more in fabric and labour, and reads as occasionwear. Part-lined, meaning a lined body with sheer sleeves, is the sweet spot for most customers. Fully sheer is the cheapest and needs the right customer: it sells well as a layering piece, badly as a standalone top for most markets.
Say which one you want before we quote, because changing coverage after sampling means re-making the pattern, not just adding a lining.
Fabrics and yarns
Lace programs typically run on nylon-spandex stretch lace or corded guipure; recent production includes a sheer lace shirt on 90% nylon / 10% spandex at 190 gsm, and a cotton-blend lace for asymmetric-hem tops. Crochet bodies use cotton, viscose or acrylic yarns, chosen for how much drape you want against how much structure the stitch needs to hold.
Stretch matters more than people expect. A lace top with no stretch pulls across the back the moment a customer moves, so we usually recommend 5–10% elastane for fitted styles.
Seams, edges and finishing
Open-work fabrics have no seam allowance to speak of, so seam choice is structural. Narrow French seams, binding and clean-finished edges keep lace garments from shredding inside. Where panels meet denser sections we grade the seam so the join doesn’t bulk.
Scalloped edges can be cut to follow the lace motif or bound with a narrow binding. Each one gives a different look and carries different labour, so it is worth deciding before costing rather than after.
MOQ, sampling and lead time
50 pcs per style, sizes mixed inside that quantity. Sampling takes 7–10 days once fabric or yarn is available. Hand-crochet elements take longer and carry a different unit cost. We separate that line item rather than average it in. Bulk runs 30–55 days for machine-crochet constructions and 45–90 days for cut-and-sew lace programs. Payment is 20% deposit, 80% balance by T/T or L/C at sight. First runs start at 50 pcs per style; volume comes later.
Documentation
Care labels, fibre composition and origin labels to your requirement. EU fibre-composition labelling follows Regulation (EU) 1007/2011. Certificates are available on request with scope confirmed per destination.
What to send a crochet clothing manufacturer before sampling
A first sample needs four things from you: the tech pack or a reference garment, the stitch or lace reference, the coverage decision, and the size range with target quantities. Coverage is the one that changes the pattern, so settle it before costing rather than after sampling.
Tell us whether the design is machine crochet, hand crochet, guipure, eyelet embroidery or stretch lace. Bulk runs 30–55 days for machine-crochet constructions and 45–90 days for cut-and-sew lace programs after PP approval and material confirmation, and we quote hand-crochet detail as a separate line. The minimum is 50 pcs per style with sizes mixed. Care labels, fibre composition and origin labels are set to your market, and EU fibre-composition labelling follows Regulation (EU) 1007/2011.
Related pages
Questions buyers ask
What is the difference between crochet and lace production?
Crochet is built loop by loop and behaves like a knit. Lace arrives as a fabric and is cut and sewn like a woven. The cost drivers, lead times and minimum quantities differ, so we confirm which route each design needs before quoting.
What is your MOQ for crochet and lace styles?
50 pcs per style, sizes mixed within that quantity. Hand-crochet elements carry a different unit cost and usually a different timeline, so we quote them as a separate line rather than averaging them in.
Can you add lining to lace garments?
Yes, and we recommend deciding before costing. Coverage can be full, partial (body lined, sleeves sheer) or none at all, and changing it after sampling means re-making the pattern rather than simply adding a lining.
Should lace have stretch in it?
For fitted styles, usually yes. Lace with no stretch pulls across the back as soon as the wearer moves, so we typically recommend 5-10% elastane depending on the fit you want.
Do you do hand-crochet or only machine crochet?
Both. Machine crochet suits most volume programs. Hand-crochet elements are used for detail work and carry their own cost and time line, which we break out in the quote. The detail behind four inspection points before packing sits on a separate page. You can request a quote for this category, and we will come back within 24 hours.

High Neck Lace Long Sleeve Blouse

Crochet V-Neck Cropped Cardigan

Burgundy 3D Floral Textured Puff Sleeve Top

Tie-Front Kimono Cover-Up

Crochet Wide Leg Pants

Sheer Lace Button-Down Blouse

Sheer Floral Print Lace Long Sleeve Top

White Wavy Lace High Neck Long Sleeve Top

